Notice of Public Meeting: US 380 Prosper/Frisco widening from Teel Pkwy/Championship Drive to west of Lakewood Drive
By Texas Department of Transportation
May 10, 2022
Print this page
Email this article

Notice of Public Meeting

US 380 Prosper/Frisco widening from Teel Pkwy/Championship Drive to west of Lakewood Drive
CSJs: 0135-11-024, 0135-02-068, 0135-10-065
Denton and Collin counties, Texas

Frisco, Texas -- The Texas Department of Transportation (TxDOT) is proposing to widen US 380 from Teel Parkway/Championship Drive in Denton County to west of Lakewood Drive in Collin County, Texas. This notice advises the public that TxDOT will be conducting an in-person and online virtual public meeting on the proposed project. The same information will be available at both the in-person and virtual meetings.

The in-person meeting will begin at 6:00 p.m. and will follow an “open house” format. The virtual meeting is not a live event and the materials can be viewed online at your convenience. The purpose of the meeting
is to present the proposed project and receive public comment.

In-Person Meeting

Tuesday, May 10, 2022
6:00 p.m. to 8:00 p.m.
Rock Hill High School Cafeteria
16061 Coit Road, Frisco, TX 75035

Virtual Meeting

Tuesday, May 10, 2022, at 6:00 p.m. through Wednesday,
May 25, 2022, at 11:59 p.m.
www.keepitmovingdallas.com/US380ProsperFriscoWidening
*Not a live event

TxDOT is proposing to reconstruct 5.9 miles of US 380 from Teel Parkway/Championship Drive in Denton County to west of Lakewood Drive in Collin County. The proposed project involves the full reconstruction
of the existing five-lane rural roadway in Denton County and six-lane urban roadway in Collin County to a six-lane divided highway with two to three-lane continuous frontage roads.

In addition to adding lanes, the proposed design includes drainage improvements, ramps to provide accessibility, interchange improvements to meet safety and/or capacity requirements, and shared use paths along both sides of the corridor. The roadway passes through the cities of Frisco, Prosper and McKinney. The existing US 380 right-of-way (ROW) width ranges from 158 to 287 feet throughout the length of the project. The proposed ROW width varies from 245 to 522 feet with a typical ROW of 336 feet. The proposed improvements would potentially require approximately 145 acres of new ROW.

The proposed project would require additional ROW and potentially displace structures on commercial and/or residential properties. Relocation assistance is available for displaced persons and businesses.

Information about the TxDOT Relocation Assistance Program and services and benefits for those displaced and other affected property owners, as well as information about the tentative schedule for ROW acquisition and construction, can be obtained from the TxDOT Dallas District office by calling (214) 320-6675 or online at the project website.

Any environmental documentation or studies, maps and drawings showing the project location and design, tentative construction schedules, and other information regarding the proposed project are on file and available for inspection Monday through Friday between the hours of 8 a.m. and 5 p.m. at the TxDOT Dallas District office at 4777 East Highway 80 Mesquite, Texas 75150. Project materials are also available online at www.keepitmovingdallas.com/US380ProsperFriscoWidening. These materials will be available in hard copy form for review at the in-person meeting.

The public meeting will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be
provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the public meeting, please contact the Dallas District Public Information Office, at (214) 320-4480 no later than 4 p.m. on Wednesday, May 4, 2022. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange.

Written comments from the public regarding the proposed project are requested and may be submitted by mail to the TxDOT Dallas District Office, Attn: Seung Yoo, P.E., 4777 East Highway 80 Mesquite, Texas
75150 or by email to
Seung.Yoo@TxDOT.gov. Verbal comments may be submitted by leaving a voicemail at (833) 933-0443. All comments must be received on or before Wednesday, May 25, 2022.

Responses to comments received will be available online at the project website once they have been prepared.

If you have any general questions or concerns regarding the proposed project or the meeting, please contact the TxDOT project manager, Seung Yoo, P.E., by phone at (214) 320-6178, or by email at Seung.Yoo@TxDOT.gov. The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 9, 2019, and executed by FHWA and TxDOT.